New Safe Confinement: current status

New Safe Confinement: current status
Within the NSC Project at the construction site the following works are being performed: Assembly of the Arch metal structures (for 2nd lifting) According to the design – 4,097 tons 3,793.15 tons (92.58%) performed Installation of the Arch roof’s outer cladding Surface area of roof cladding before […]Read more

Vasya Pogrischuk

Vasya Pogrischuk
Born on: 08/03/2002. Disease: Ewing’s sarcoma. Vasya needs 2,441.50 UAH ($310) for MRI for further diagnostics. One of the recent patients is Vasya Pogrischuk from Ternopil, who recently survived chemotherapy. We would like to thank everyone who showed his or her support for Vasili by donating money […]Read more

NSC construction progress

NSC construction progress
Within the NSC Project at the construction site the following works are being performed: Assembling of basic and supporting structures of the Arch; Assembling of guiding slide supports for Lifting No.2; Assembling of air ducts of the Arch; Assembling of crane beams of the main crane system; […]Read more
Chernobyl Foundation
40 King Street West
Toronto, Ontario, M5H 3C2

+1.416.731.0988 [Canada/US]
+38.099.552.8798 [Ukraine]

Latest Posts